Sign In | Join Free | My frbiz.com
China Shanghai Yekun Construction Machinery Co., Ltd. logo
Shanghai Yekun Construction Machinery Co., Ltd.
Shanghai Yekun Construction Machinery Co., Ltd.
Verified Supplier

6 Years

Home > Pile Driver Long Boom >

3 Ton Vibro Hammer For 15 Meter Piling Depth For Excavator

Shanghai Yekun Construction Machinery Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

3 Ton Vibro Hammer For 15 Meter Piling Depth For Excavator

Brand Name : VIBRA

Model Number : PCF-350

Certification : ISO 9001:2015

Place of Origin : SHANGHAI

MOQ : 1 set

Price : Negotiation

Payment Terms : T/T, D/P, Western Union, MoneyGram, L/C

Supply Ability : 15 set/month

Delivery Time : 7-35 days

Packaging Details : 5.824 CBM

Name : Vibratory Pile Driving Equipment

Feature : Eco Friendly and fitted with any brand of excavator

Extension Arm : 750 KG

Operation Pressure : 32 MPA

Hammer Weight : 2950 KG

Vibration Frequency : 3500 RPM

Centrifugal Force : 470 KN

Excavator Weight : 40~45 Ton

Maximum Piling Depth : 15 meter

Color : Blue/Yellow/Red/White, customized color available

Material : Steel, Core materials are all imported

Type : Hydraulic Vibrating Hammer

HS Code : 8430100000

Condition : New

Contact Now

3 ton vibro hammer for 15 meter piling depth suitable for any brand of excavator

VIBRA vibrating pile hammer is utilizing its high frequency vibration to vibrate pile body with high-speed increase to pass the vertical vibration of mechanical produce to pile which prompting changes in the soil structure around the pile, strength decline. Soil around the piles become liquefaction to lessen frictional opposition between side of the pile and the soil. Then, at that point, utilizing the excavator down power, vibrating pile hammer and pile body weight to sink pile into the soil. When extricating piles, in the state of vibration to take out the pile by utilizing excavator lift power. Excitation power required by pile driving hardware are extensive controlled by site soil, soil condition, dampness content and sort of pile development.

Technical Parameter

Item Model PCF-300 PCF-330 PCF-350 PCF-450 PCF-500
Vibration Frequency rpm 3500 3300 3500 3300 3200
Operation Pressure Mpa 32 32 32 32 32
Centrifugal Force kn 385 420 470 535 585
Max. Pile Length m 12 12 15 18 21
Arm Weight kg 750 750 750 820 820
Hammer Weight kg 2750 2850 2950 3150 3350
Excavator T 27~30 33~38 40~45 47~55 55~70

Advantages

  • Pile driving steel sheet pile, cement pile, steel rail pile, iron plate, H steel
  • Quick converting operation; Applied to various working environments.
  • Compared to other systems, less force required for pile pulling
  • Not damage the top or bottom of steel pipe pile, steel plate pile and steel rail pile.
  • Not damage the building even often work near it.
  • Adopted Rubber sheath to reduce noise and vibration, the operation is quiet and the working period is short; It is helpful to overcome environmental problems.
  • According to the placement direction of sheet pile and site conditions, the sheet pile can be clamped or lowered by positive and negative rotation of 180 °. The vibration frequency can be adjusted by two levels, and the two-level double pumps are combined to greatly increase the excitation force.

Working Principle

Hydraulic vibrating pile driver take the advantage of high frequency vibration generated by motor and transit the vibration force to the hydraulic vibrating pile driver for the surrounding soil liquefying & break its structure to reduce the friction; then piling or drilling the pile form the soil ground via excavator. The high frequency vibration is driven by the hydraulic motor of the excavator.

The hydraulic motor drives the two eccentric axes to rotate at high speed in opposite direction. The horizontal force of the eccentric axis cancels each other without vibration. The vertical forces add up to each other, creating a vertical-frequency vibration.

Machinery Characteristics

  • The control system adopts integrated import control valve, each action can be controlled independently, convenient for maintenance and check.
  • The vibration frequency is controlled at two stages, and the second stage vibration is the confluence of double pumps, which greatly increases the excitation force and overcomes the special geology.
  • Mini and light weight design make application flexible.
  • Taking the advantage of the excavator hydraulic system without other driving system requirement, which save fuel oil and transportation cost.
  • The operation is simple and easy to learn. The driver who has the operation foundation of excavator can operate it with practice

About Us

Shanghai yekun Machinery Co., Ltd was founded in 2009, A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our company take the latest high speed hydraulic vibrating pile driver and its components as the main products. Our products vastly apply for infrastructure & construction industries.

We focus on product quality with the latest industrial technology. The mini hydraulic vibrating pile driver lead the industrial trend. The middle and large hydraulic vibrating pile driver also are highly recognized by our clients. At the same time, we actively cooperated with the engineering machinery factory and construction company to jointly develop more functional professional equipment, and we hired foreign professionals as our technical adviser.

Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.

FAQ

Q: How long is the warranty period ?

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

Q: What is the MOQ ?

A: 1 set is available.

Q: What's the payment method ?

A: We accept T/T and D/P payment.

Q: What is the delivery time ?

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

Q: Can I have our LOGO on the machine ?

A: Of course you can.

Q: How is your product quality ?

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

Q: Can I be your dealer ?

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!


Product Tags:

3 Ton Vibro Hammer

      

Excavator Vibro Hammer 15m

      
China 3 Ton Vibro Hammer For 15 Meter Piling Depth For Excavator wholesale

3 Ton Vibro Hammer For 15 Meter Piling Depth For Excavator Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Shanghai Yekun Construction Machinery Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)